![]() ![]() in Auburn Hills was completed through design-bid-build contract delivery. Segment 1, the northernmost portion from north of Coolidge Highway in Troy to north of South Blvd. The project will be delivered through a 30-year design-build-finance-maintain availability payment concession that combines what would have been 5 construction segments under design-bid-build and traditional finance methods into one segment, and accelerates the completion date by 12 years. Additionally, the project will construct a 14-foot diameter drainage tunnel from 8 Mile Road to 12 Mile Road to separate and meter freeway water from the local storm system to mitigate future flooding concerns. The project will widen a portion of the segment with the addition of an HOV/general purpose lane in both directions from the 8 Mile Road to 12 Mile Road. Also included is a safety upgrade that separates traffic entering northbound I-75 from I-696, and northbound I-75 traffic exiting at 11 Mile Road. Segment 3 consists of complete pavement reconstruction, modernization of the freeway, ITS upgrades, and replacement of 28 bridges (22 vehicle overpasses and ramps and 6 pedestrian structures). It is an important commercial, commuter, tourist, and local area business route moving people and goods across the state daily. The need for increased capacity to relieve congestion has been driven by growth along the corridor from land use changes and migration of people, services, and industry. The full project's 18-mile corridor has not received comprehensive improvements since it opened in the 1960s. Segment 3 is a 5.5-mile segment located north of 8 Mile Road to north of 13 Mile Road in the Cities of Hazel Park, Royal Oak, and Madison Heights, Oakland County. ![]() When it rains, please slow down.Segment 3 of the Michigan Department of Transportation's (MDOT) I-75 Modernization Project will complete the reconstruction and widening of I-75 from M-102 (8 Mile Road) to south of M-59 in Metro Detroit. “Again, rain and bad driving behaviors just don’t mix. “We were extremely lucky that this crash did not end in an explosion and fatalities.” MSP F/Lt Mike Shaw stated. The 27-year-old was cited for careless driving and for not having insurance. Seven people were transported to a hospital and three of them were treated for minor injuries. All lanes of northbound and southbound I-75 were closed for the cleanup. HAZMAT was on the scene to clean up the gas and oil spillage. The tanker portion of the truck did not catch on fire. That driver was able to exit before her vehicle caught on fire. When the tanker truck stopped, the chassis of the truck, with the gas tanks, caught fire.Īnother vehicle also flipped on its side due to the concrete that broke off and their vehicle ended up stopping near the truck chassis that was on fire. The cab of the tanker truck flipped over the media wall and landed on the southbound lanes of I-75 with the driver still inside. The 27-year-old’s vehicle flipped on its side after striking the tanker truck. The crash into the median wall knocked down a light pole and caused concrete to break off, blocking all lanes on southbound I-75. The tanker truck driver lost control and struck the median wall. Michigan State Police said a 27-year-old was speeding northbound on I-75 when they lost control of their vehicle and struck the side of a tanker truck carrying 10,000 gallons of fuel. DETROIT – Three people were treated for minor injuries after a crash involving a tanker truck closed both directions of I-75 near Warren Avenue in Detroit for several hours on Friday. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |